Global Trade Alert
Global Trade Alert

India: Localisation requirement for setting up a CO2 closed brayton cycle-based energy storage system at NTPC Kudgi

Announcement

04 Oct 2024

On 4 October 2024, an Indian government owned-company announced a tender to set up an energy storage system with a local preference for local vendors.

Source

Sign in to access

Number of interventions

1

1 certainly harmful

0 likely harmful

0 liberalising

List of interventions

Implementation date

04 Oct 2024

Revocation date:

No revocation date

Updated: 04 Oct 2024
Public procurement preference margin In force

On 4 October 2024, NTPC Limited, an Indian government-owned entity, notified the tender for setting up a CO2 Closed Brayton Cycle-based Energy Storage System at NTPC Kudgi. According...

Sign in to see more

Threads

See all

This state act is not part of any Thread yet.