Global Trade Alert
Global Trade Alert

Back to state act

Indonesia: Capped input price of coal for power stations

Description

The Energy Ministry decree 23/2018 requires coal miners to sell at least 25% of their production to power stations at a capped price of 70 USD per metric ton. According to media reports (cf. secondary...

Sign in to see full description

Intervention Details

Intervention Type

Price stabilisation

MAST Chapter

L: Subsidies (excl. export subsidies)

Implementation date

09 Mar 2018

Revocation date

31 Dec 2019

Implementation level

National

Affected flow

Inward

Announced as temporary

Yes

Eligible firms

state-controlled

Affected Trading Partners

Graph

Table

Affected Sectors

Sign in to access 1 sectors

Affected Products

Sign in to access 1 products

Threads

See all

This intervention is not part of any Thread yet.