Global Trade Alert
Global Trade Alert

Back to state act

Germany: EXIM financing for the delivery and construction of 10 wind turbines for the construction of a wind park with a total capacity of 27.5 MW in September 2013

Description

The export loan was announced in September 2013 and finances the delivery and construction of 10 wind turbines for the construction of a wind park with a total capacity of 27.5 MW ('Lieferung und Mont...

Sign in to see full description

Intervention Details

Intervention Type

Trade finance

MAST Chapter

P: Export-related measures (incl. subsidies)

Implementation date

30 Sep 2013

Revocation date

No revocation date

Implementation level

NFI

Affected flow

Outward subsidy

Announced as temporary

No

Eligible firms

firm-specific

Affected Trading Partners

Graph

Table

Affected Sectors

Sign in to access 6 sectors

Affected Products

Sign in to access 7 products

Threads

See all

This intervention is not part of any Thread yet.