Global Trade Alert
Global Trade Alert

Switzerland: EXIM financing for the construction of a power plant (6x5MW) in Algeria in June 2010

Announcement

30 Jun 2010

In June 2010, the Swiss Export Risk Insurance (SERV) announced its support of an export project concerning the construction of a power plant (6x5MW) in Algeria.

Source

Sign in to access

Number of interventions

1

1 certainly harmful

0 likely harmful

0 liberalising

List of interventions

Implementation date

30 Jun 2010

Revocation date:

No revocation date

Announced: 30 Jun 2010
Trade finance In force
The project value is 89 million CHF (83 million USD) and it finances the construction of a power plant (6x5MW) by TURBOMACH SA. The maturity of the loan will be longer or equal to two years. The SE...
Sign in to see more

Threads

See all

Harmful Trade Policy Measures

This Thread tracks harmful trade policy interventions affecting all products. Covering all types of interventions monitored by Global Trade Alert, it highlights how the yearly number of these measures has evolved over time.

Published: 04 Sep 2024

71490

interventions

194

jurisdictions